Agbulos, A, Mohamed, Y, Al-Hussein, M, AbouRizk, S and Roesch, J (2006) Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Journal of Construction Engineering and Management, 132(03), 291–9.

El Wardani, M A, Messner, J I and Horman, M J (2006) Comparing Procurement Methods for Design-Build Projects. Journal of Construction Engineering and Management, 132(03), 230–8.

  • Type: Journal Article
  • Keywords: Delivery; Design/build; Construction industry; Procurement;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
  • Abstract:
    The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals.

El-Diraby, T E (2006) Web-Services Environment for Collaborative Management of Product Life-Cycle Costs. Journal of Construction Engineering and Management, 132(03), 300–13.

Ellis, R D and Lee, S (2006) Measuring Project Level Productivity on Transportation Projects. Journal of Construction Engineering and Management, 132(03), 314–20.

Hinze, J, Devenport, J N and Giang, G (2006) Analysis of Construction Worker Injuries That Do Not Result in Lost Time. Journal of Construction Engineering and Management, 132(03), 321–6.

Kaiser, M J (2006) Offshore Decommissioning Cost Estimation in the Gulf of Mexico. Journal of Construction Engineering and Management, 132(03), 249–58.

Lee, D and Arditi, D (2006) Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Journal of Construction Engineering and Management, 132(03), 268–77.

Soetanto, R, Dainty, A R, Glass, J and Price, A D (2006) Empirical Evaluation of Structural Frame Performance Criteria: Realizing the Potential of Hybrid Concrete Construction. Journal of Construction Engineering and Management, 132(03), 278–90.

Tang, W, Duffield, C F and Young, D M (2006) Partnering Mechanism in Construction: An Empirical Study on the Chinese Construction Industry. Journal of Construction Engineering and Management, 132(03), 217–29.

Wibowo, A (2006) CAPM-Based Valuation of Financial Government Supports to Infeasible and Risky Private Infrastructure Projects. Journal of Construction Engineering and Management, 132(03), 239–48.

Zhang, H, Li, H and Tam, C M (2006) Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints. Journal of Construction Engineering and Management, 132(03), 259–67.